bad weekend
tiger, family, emma, arne June 3rd, 2008At one point late Sunday morning I found myself literally shivering as stress and anxiety washed over my body.
Friday night: the backup air conditioner died. After a few fruitless calls to friends and family in search of a couch for the night and the realization that a motel would cost at least $50 each night, we drove to Lowe’s at 8:30 PM and bought a new wall unit for the converted garage. We took out the old, dead unit, installed the new one, and insulated with rolled-up blankets. Not ideal, but sufficient, and enough to allow us to sleep comfortably, even if it was for less time than we might have chosen.
Saturday morning: After breakfast, Emma and I went back to Lowe’s to buy new molding and insulation to finish the a/c installation. We had just started to figure out how we wanted to do it when Emma’s cell phone went off, saying she was late to work. Work she didn’t know she was scheduled for. Work that took away her first day off in two weeks.
Saturday afternoon: High point of the weekend. I did a little work and played a little WoW. Emma got some sleep, before having to work the overnight shift.
Saturday night: Nightmares. Recurring dreams of being paralyzed and unable to speak, presumably linked to anxiety over my looming committee meeting.
Sunday morning: Lowest point. Tiger dies. Racking pangs of shock and sorrow and grief. Much of the rest of the morning is a blur. I know we eventually took her cage outside — having the empty cage was clearly going to be too heart-wrenching — and had to find some food before Emma collapsed. In an attempt to keep ourselves moving (I would have chosen to lie down on the couch and done nothing), we went back to Lowe’s and bought the materials to close up the hole around the a/c. By Sunday afternoon we found ourselves out at my folks’ house, who have been wonderfully helpful and supportive. Emma had a good nap and I floated in the pool for an hour, doing and thinking about nothing.
Sunday evening: We buried Tiger under a Korean dogwood, next to the garden. We gave her lots of treats, her favorite chew toy, and a lot of sand, which she loved to play in.
My committee meeting went decently on Monday, which was a huge relief. They seemed pleased with the progress I’ve made in the last month and want to see me again in another month. Work harder, work harder.
The air conditioner installers were out at the house this morning to replace the main unit. Naturally, we won’t be able to replace just the outside unit — codes, you know — so at the moment I’m waiting to hear from the credit union about financing. If approved, they’ve offered us an 11.5% interest rate, which seems like a decent sign that we’ll be approved, but we’re still waiting. Once the financing is approved, it will take about three days to get the unit ordered, delivered, and installed. In fact, if I can get this ordered by 2 PM tomorrow, we can have the air conditioner installed on Friday. I can live with that.
Leave a Reply
You must be logged in to post a comment.


Recent Comments